So far I've managed to finish four GAL knitting projects, with two more on the needles.
The cowl is behaving itself much better, but is currently my work lunchtime knitting, and since I only get 30 minutes and I have to eat my lunch during that time too, I'm lucky if I get much more than one or two rounds done at a time.
Finally I've been working on a spinning project. The final result of that is below, and I'll post again in a few days to give more details of how it was produced.